🖨️ Download as PDF
Technical sheet
Pentagone Header Penta
/ PA4GTI
Equipement de mise à la terre et en court-circuit pour réseaux aériens nus - 4 éléments
See online technical sheet
/ Standards
Penta Bulletpoint CEI 61230
/ Use
The NEVERS device enables a single operator to perform :
- Check for absence of voltage.
- Ground and short-circuit overhead HV lines up to 11m high from the ground.
/ Advantages
Penta Bulletpoint Installation of a very high ground malt from the ground level
Penta Bulletpoint System that facilitates the installation of malt
Penta Bulletpoint Ensures effective contact with the cable
/ Areas of activity
Electrical distribution
Civil security
Transport
Document not contractually binding, errors and omissions excepted
pentaesp.com
Logo Penta
Technical sheet
Pentagone Header Penta
/ Technical specifications
Penta BulletpointProduct kind : Dispositif
Penta BulletpointOperating voltage (V) : HTA (1 000 V to 50 000 V)
Penta BulletpointField of use (environment) :
Penta BulletpointIn line (aerial) : Isolated
Penta BulletpointWay of access : From the floor
Penta BulletpointShort-circuit intensity kA/1s : 8
Penta BulletpointMeasurement : 2700x1000x10mm
Penta BulletpointWeight (kg) : 29
/ Accessories
Reference Designation
NE27 Maintenance kit for telescopic metal poles
NE38 NE11 gripper tip
NE14 Self-locking clamp
NE18ER Complementary extension
NE22 Winding reel not wired
NE28 Insulated pole maintenance kit
NE25 1 set of 3 braids 35mm², length 10m
NE21ALU Winding reel with aluminium cables and earth clamp
/ Products contained in the kit
Reference Designation
NE24 NEVERS carrying case
NE21 Cable reel with copper cables and grounding clamp
NE11 Telescopic metal pole
701 Hexagonal ground rod.
NE19E Lower extension for insulating pole
NE23 Pole lifter rod
NE17E Top part of insulating pole
NE18E Lower part of insulating pole
Document not contractually binding, errors and omissions excepted
pentaesp.com
Logo Penta