Pole
📁 Our ranges [...] Live Working (MV/HV) Manoeuvring poles LW03-17
EU Certificate

LW03-17

Insulator rubber skirts
EU Certificate
Technical sheet
/ Areas of activity
Transport
/ Use
The skirts are mounted on the insulating tubes Ø 32, 39, 64 mm. / 1 1/4’’, 1 1/2’’, 2 1.
In the working position, the larger diameter part of the skirts must always face downwards.
In all cases, skirts must be used in pairs.
A pair of skirts consists of two skirts joined together.

Skirts are used:
to avoid the water flow along an insulating pole whilst working in wet conditions.
In this case, the pole is equipped with a pair of skirts.

The insulating tubes must be equipped with :
A pair of skirts, if the voltage of the network is 63 kV, 90 kV or 150 kV,
Two pairs of skirts, if this voltage is 225 kV or 400 kV.
Note: The skirt fitting tool must be coated with silicone grease before fitting the skirts.
/ Technical specifications
Penta Bulletpoint Pole kind : Pole accessories
Penta Bulletpoint Work type : Live working
Penta Bulletpoint Operating voltage (V) : HTB (> 50 000 V)
Product reference Accessory weight (kg) Accessory weights (lbs) Diameter(s) (mm) Accessory type Pipe diameter (mm) Pipe diameter (inch) Technical sheet Quantity
LW03-17-J-32 0.04 0.1 int: 30 - ext: 70 Jupe 32 1''1/4
Pulse 32 Darkbg
LW03-17-J-39 0.02 0.1 int: 35 - ext: 70 Jupe 39 1''1/2
Pulse 32 Darkbg
LW03-17-J-64 0.12 0.3 int: 60 - ext: 121 Jupe 64 2''1/2
Pulse 32 Darkbg
LW03-17-OPJ-32 0.4 0.9 55 Outil de pose 32 1''1/4
Pulse 32 Darkbg
LW03-17-OPJ-39 0.45 1.0 55 Outil de pose 39 1''1/2
Pulse 32 Darkbg
LW03-17-OPJ-64 1.1 2.4 78 Outil de pose 64 2''1/2
Pulse 32 Darkbg