🖨️ Download as PDF
Technical sheet
Pentagone Header Penta
/ Dispositif mobile
Mobile earth rod for high connection with clamps for clamps fixed on HV substations and busbars
See online technical sheet
/ Standards
Penta Bulletpoint IEC 61219
/ Use
Assembly the device connecting the two parts of it (insulating rod and conductive rod). Insert the lance into the sleeve of the lance earthing contact.
Thanks to this first operation, the weight of the lance device is supported by the lance contact placed to the ground potential.
Then you can slide the device and rotate until it reaches and hooks the contact placed on the HV conductor.
/ Areas of activity
Industry
Civil security
Transport
Document not contractually binding, errors and omissions excepted
pentaesp.com
Logo Penta
Technical sheet
Pentagone Header Penta
/ Technical specifications
Penta BulletpointProduct kind : Dispositif
Penta BulletpointOperating voltage (V) : HTB (> 50 000 V)
Penta BulletpointField of use (environment) :
Penta BulletpointStation office : After electric meter
Penta BulletpointAfter electric meter : Industria
Penta BulletpointShort-circuit intensity kA/0.5s : 63
Penta BulletpointShort-circuit intensity kA/1s : 40
Document not contractually binding, errors and omissions excepted
pentaesp.com
Logo Penta